Label: Nuts and Bolts
Last week we wrote about housing for our imaginary railway.
Now at this point I am not about to tell you that the housing situation is
solved. Far from it. I'm not even going to say that it is even well started.
Good things take time. The update this week is about production. The specific
production goal right now is twelve boxcars, various types potentially. The
goal also includes the shifter rework and a road engine and a caboose. I
actually wish all this was done but accuracy and quality do take time. The
sticking point has been a method to batch produce components. I am happy to
report that the method was developed then upgraded. So, into the woods we go
(!?). still busy, omscaler