Label: More complicated
And now it gets more complicated. As I complete the
“reworked” test track, I can see where there is the need for a turnout (also
called switch). The reason being that when the main oval is complete, there is
no way to put equipment into/ on the track. This is one aspect that readers may
not yet comprehend. Specifically, The Omega Scale Railway is so small that it
is powered by a sub-surface conveyor. The turnout then is necessary to put
equipment onto an oval track. This is, a matter of fact, what happened before.
Your omscaler got the cart out in front of the horse. I got the oval assembled
without the drive cable. I did leave a panel on one side for the purpose of mounting
the drive unit and placing cars with their subsurface retainers on the track.
However, this was not what was needed. So, now we have our ducks in a row. And
forward we go! (Hey look I'm a poet!) Omscaler