A.R.T. REFRIGERATOR CARS

A group of four new refrigerator cars soon to be forwarded to the Port of Mobile.

Tuesday, October 14, 2025

The loop is incomplete

Yes. The loop is incomplete, but to be precise, the lower layers are complete. The top “channel layer” is nearing completion. Also, the drive unit is assembled but not connected. Part of what is needed is an indication of where all turnout throws will be installed. Most of these things should happen relatively soon. Omscaler believes that once the drive unit is installed, it will need to be tested. It will probably need to be modified to work well. Followed by more testing. All this is a common occurrence on The Omega Scale railway. See readers on the next post, omscaler