“Linkage success”, is that even a word? Well, if it wasn’t before, it is now. Or maybe a phrase? The main point is that this past Sunday saw successful operation with the locomotive linked to the drive cord. Omscaler thinks that even though this is working, the results over time may need to be improved upon. We shall see. All in all, omscaler is happy with the current outcome. Next will be work on a drive unit. This will be challenging. Still forging ahead, omscaler