A.R.T. REFRIGERATOR CARS

A group of four new refrigerator cars soon to be forwarded to the Port of Mobile.

Tuesday, March 24, 2026

Getting the railroad moving

Successful test runs of a locomotive (2-8-0) with tender and a single boxcar have been made. To get to this point, I had to backtrack quite a bit. First was a redo of the connecting linkage. Then an alignment check of the track bed. The planned drive gear was abandoned altogether. What is working is a half inch “pin comb” which is manually pushed into the drive cord at a somewhat distant point from the train. This is simply moved along the track. Goofy but it works. At this point a small “peddler freight” consisting of two boxcars and one covered hopper are operating on the Alto Pass module. Testing shows that the “drive” curved section in needing an upgrade. This will be worked out soon. Next on the drawing board is an upgrade of two each flatcars and gons. The planned drive unit is believed to require a spur gear of a material yet to be determined. A rigid bushing and a fixed axle. Much more complicated than omscaler was hoping. It is believed that in time a solution will present itself. See our faithful readers next post. Until then, omscaler