As readers recall, last week’s post referred to channel building. As part of that, turnouts should be installed as well. The initial test turnout installation revealed a discrepancy in the sub-surface turnout “chamber” height. At this point omscaler recalled having to build a platform under each turnout which were installed on previous modules. In order to simplify this process, it was decided to raise the height of the turnout chamber and eliminate the need for platform under the turnouts. Doing this called for adjusting the measurements on the dimension diagram sheet. This was done in a slow and meticulous manner. At the writing of this post, turnout building is moving forward. Until next time, omscaler