Working the work
As omscaler mentioned in the last post, the shifter is in the shop for a rebuild. This effort may represent a leap in equipment operation and appearance of a somewhat major scale. Omscaler has used new and
innovative techniques to improve the switching locomotive. However, and this is a big however, to do this requires as many components as possible to be rethought and often redesigned. This redesign is almost literally top
to bottom. As demonstrated by the tender results, the effort is well worth it. On the other hand, the process is very slow relatively speaking. But as omscaler has said before, “we’ll get ‘er done”.
And we will. Omscaler
No comments:
Post a Comment